SLS Mechanical Engineering

Web:   Peter Wiegand  (peter.wiegand@psi.ch)
Letzte Aktualisierung/Last Update: 24. 02. 2000

Links:

SLS - Homepage
SLS Storage Ring - Magnet Girder and Mover System
SLS Storage Ring - Front Ends
SLS Vacuum System
Peters - FEM page  (Finite Elemente Methode - calculations, documents etc.)

Staff:

Mech. Engineering Group  (MEG):

Sasa Zelenika  (GL)

WSLA 225

Tel. intern  4586

sasa.zelenika@psi.ch

Simone Flechsig

WSLA 227

Tel. intern  3343

simone.flechsig@psi.ch

Rudolf Reiser

WSLA 226

Tel. intern  5110

rudolf.reiser@psi.ch

Martin Rohrer

WSLA 228

Tel. intern  4084

martin.mrohrer@psi.ch

Daniel Rossetti

WSLA 226

Tel. intern  2886

daniel.rossetti@psi.ch

Peter Wiegand

WSLA 228

Tel. intern  4530

peter.wiegand@psi.ch

Vacuum Group:

Lothar Schulz (GL)

WSLA 016

Tel. intern  4532

lothar.schulz@psi.ch

Theo Bieri

WSLA 016

Tel. intern  4276

theo.bieri@psi.ch

Gaiffi Nazareno

WSLA 017

Tel. intern  5108

gaiffi.nazareno@psi.ch

Michael Knecht

WSLA 017

Tel. intern  5107

(temp.)

Peter Mueller

WSLA 017

Tel. intern  5107

(temp.)

Werner Rohrer

WSLA 017

Tel. intern  5107

(temp.)

Martin Steinacher

WSLA 017

Tel. intern  5107

(temp.)

Front Ends:

Chen Qianghong

WSLA 225

Tel. intern  4589

qianghon.chen@psi.ch

 

Status: 02/2000

Mech. Engineering Group

engineering and series production of the SLS SR girder and mover system finished

48 girder with mover delivered. final assembling and installation with magnets under process,

girder and mover control system (GMCS) delivered, final installation under process,

functionality tests of the mover control system finished w.o. problems,

engineering of HLS (Hydrostatic Levelling System) and HPS (Horizontal Positioning System) under process,

 

Vacuum Group

engineering and series production of the SLS booster vacuum system has been finished,

assembly and installation of the booster vacuum system is in progress,

engineering of the SLS SR vacuum chambers has been finished and they are under production,

the first vacuum sections of the SLS SR have been installed in the SR tunnel and are under vacuum,

the bellow design for the straight sections has been finished in collaboration with the LURE vacuum department .


The text documents are stored in PDF (Portable Data Format). To read them with older web browsers you may need the specific reader application
"Adobe Acrobat Reader" which can be downloaded from the Web for free.
Click for downloading: